Thursday, March 31, 2011

275 kV XLPE Cable Bridge & PEDESTRIAN CROSSING

Artists imression of the new bridge at Bonython Park (courtesy ELECTRANET)





















NOTE TO CRANE FANCIERS: The lift will be happening before the end of May. At this stage, (17/5/2011) the results of soil compression tests are requyired before the   cranes can access the site            A new 38m span concrete bridge crossing the River Torrens at Bonython Park is now under construction
Of particular interest is the integration of the cable installation and operation alongside high pressure gas mains located on common structures, and security from vandalism or falling tree branches

 Bridge under construction showing cable form-guides


the span on Bonython Park ready to load


















The Bowden /Thebarton  area now has a large range of infrastucture planned or existing, and is a focal point for pedestrian & cycle paths, gas, water, high voltage electricity,  train, tram and motor transport.

Saturday, March 5, 2011

DEMOLITION AT CLIPSAL

Demolition work well advanced on the first devlopment block (7th-8th streets Bowden)


An interesting wooden framed highrise being considered for the Melbourne Carlton Site. (hat tip to Andrew at Urban Rediscovery

Grocon's 'passive house' apartments to take shape in new carbon economy